Why Is Caribbean Electricity So Expensive, and What Would It Take to Change That?

Caribbean households and businesses pay more than double the world average for electricity, and imported oil, aging grids and taxes explain most of the gap. Drawing on our conversation with economist Marla Dukharan, we ask what it would take for renewables and local generation to bring bills down.

GELI Research Team4 min read

Electricity in Barbados costs close to the Caribbean average, but once adjusted for the cost of living, it is the third most burdensome in the region (Dukharan 2026). In our episode “Guyana’s Oil Windfall and the Limits of GDP” with economist Marla Dukharan, co-publisher of the Caribbean Energy Price Index alongside SOL Ecolution, she explained that the index adjusts each territory’s prices for local purchasing power. As she put it, the index “tells you how affordable that electricity is” (GELI 2026). On nominal prices, Caribbean households and businesses currently pay more than double the world average (Dukharan 2026). But why is Caribbean electricity so expensive, and what would it take to change this?

Why Caribbean electricity bills are so high

Dukharan pointed to three reasons for the gap between Caribbean electricity prices and global ones, which she summed up as “the raw material, the power generation, and the taxes” (GELI 2026). The first is heavy dependence on oil imports, which represent 90% of the petroleum consumed in Caribbean countries, compared to a global average of 21% (World Bank 2025). These imports are expensive in normal times, and prices soar during supply shocks. WTI crude rose from about $67 a barrel in late February 2026 to a peak of around $112 to $113 in March and April amid the closure of the Strait of Hormuz (Dukharan 2026).

The second reason is aging infrastructure, which in several Caribbean countries can mean that 15% to 30% of electricity produced is lost (Siroit, López Peña, and Proietti 2025). Grid reliability also varies, as Barbados averages just three hours of power outages per customer per year, while Guyana averages approximately 90 hours (Mercer-Blackman et al. 2026). An unreliable grid adds further costs, with over half of firms surveyed in Jamaica owning backup generators (Mercer-Blackman et al. 2026).

The third reason is taxes and surcharges, which add to bills and pass fuel cost upticks straight to consumers. Grenada, for example, normally applies a 6% customs service charge to the diesel imported for power generation and charges VAT on electricity bills. Amid energy shocks, some states have sought to cushion the blow on consumers. Following oil spikes in 2026, Grenada temporarily removed the customs charge and zero-rated VAT on the non-fuel component of electricity bills from August until December (KPMG 2026). Barbados, meanwhile, temporarily absorbed 50% of any increase in its fuel clause adjustment (a charge that passes fluctuations in fuel prices onto consumers) above its March 2026 level (Nation News 2026). Though this lowers bills, the public budget then bears this cost instead.

But not all Caribbean states have high bills or are heavily reliant on fossil fuels for their electricity.

Two routes for doing without imported fuel

At one end of the spectrum is Trinidad and Tobago, which generates its electricity from domestic gas production. As Dukharan noted, domestic gas and subsidized electricity give Trinidad the lowest average electricity price in the Caribbean in 2026 (GELI 2026; Dukharan 2026). But cheap power begets less conservative usage, as Trinidad and Tobago consumed an average of 6,557 kWh per person in 2024, compared with 2,259 kWh across Latin America and the Caribbean in 2022 (Mercer-Blackman et al. 2026). Subsidies can also strain public finances, as in 2023 Trinidad and Tobago’s Regulated Industries Commission recommended increasing residential electricity rates by between 15% and 64% to ease pressure on the state utility (Ramsubhag 2024).

Other Caribbean states lack Trinidad’s gas and are turning to renewable sources to lower costs. The Caribbean Community (CARICOM) targeted 47% electricity generation from renewables by 2027 (IRENA n.d.). Some countries are already there. For example, Dominica’s 10 MW geothermal power plant began operations earlier this year, after 15 years of development. Dukharan said she is now “more optimistic about Dominica”: in June 2026, geothermal supplied 43% of the country’s electricity, with hydropower accounting for another 25% (GELI 2026; Dominica News Online 2026).

Belize and Suriname also get most of their electricity from renewables, generating 77.3% and 61.3% of their electricity this way in 2024, respectively, particularly through hydropower (Dukharan 2026). However, they are the exceptions. Most Caribbean countries sit somewhere between these two poles, generating electricity primarily from imported fuel while slowly adding renewables.

What it would take to lower electricity costs

Lowering electricity prices in the long term requires greater local generation, and for many Caribbean countries renewables are the main local option.

There are promising signs for Caribbean renewables, especially price-wise. For instance, in 2026, the Dominican Republic awarded contracts for renewables with a 50% battery backup capacity at 10.6 to 10.9 c/kWh beginning in 2028, which improved upon the average 14.9 c/kWh paid to generators in 2025 (Suárez 2026). More broadly, estimates found that solar in 2023 cost a tenth of what it did in 2010, and wind about 30% (Mercer-Blackman et al. 2026). In a region of small island grids, the Inter-American Development Bank (IDB) recommends scaling procurement and aligning standards at a regional level to cut costs (Mercer-Blackman et al. 2026).

However, despite some implementation, many states are not on track to meet their renewables targets. Of 13 Caribbean countries analyzed in a recent report, 11 had targets for 2030 or later. Six of these 11 set their targets as a share of generation, but by 2024 every one of them was less than 20% of the way there, and between 2021 and 2025, four countries even scaled back their renewable electricity targets (Suárez 2026).

Explanations for this slow progress vary. Ember points to rules that leave grid connections in utilities’ hands, while the IDB emphasizes small markets, high project preparation costs, and regulatory uncertainty (Suárez 2026; Mercer-Blackman et al. 2026). Barbados, where this piece began, produced just 14.4% of its electricity from renewables in 2024, shifting its 95% target for 2030 to 2035 (Government of Barbados 2025). For the time being, most Caribbean electricity bills remain tied to the price of imported fuel.